PCI Pharma Services

PCI Pharma Services - 82,000 sq. ft. pharmaceutical packaging facility at CityNorth Business Campus, Meath.
End Client: PCI Pharma Services
Developer: McGarrell Reilly
Contractor: Fajon Construction
Electrical Contractor: Callaghan Electrical
Project Background
Callaghan Electrical delivered the full electrical fitout for PCI Pharma Services’ new 82,000 sq. ft. pharmaceutical packaging facility at CityNorth Business Campus, Meath.
Developed by McGarrell Reilly and built by Fajon Construction, the project forms a key part of PCI’s European expansion strategy, increasing capacity for the final assembly, labelling and packaging of pharmaceutical products - particularly injectable therapies and drug-device combination products such as autoinjectors.
The state-of-the-art facility supports commercial pharmaceutical packaging, sterile injectables, oral solid dose products, temperature-controlled storage and integrated logistics.
Designed to meet the highest sustainability and technical standards, the building targeted LEED Gold certification and achieved an A3 BER rating, incorporating advanced energy-efficient systems, rainwater harvesting and enhanced environmental controls.
The project was delivered in two phases: a base build shell fitout requiring full electrical fitout followed by an internal production and operational electrical fitout.
Challenge
This was a large-scale, high-specification pharmaceutical project with strict compliance, sustainability and operational requirements.
Key challenges included:
-
Delivering an 82,000 sq. ft. facility to pharma-grade standards
-
Meeting LEED Gold and A3 BER energy performance targets
-
Coordinating across multiple stakeholders including design team, main contractor, specialist fitout teams and PCI Pharma Services teams.
-
Completing a highly aggressive Phase 2 fitout programme within just five months
-
Ensuring all systems were designed to support clean rooms, temperature-controlled environments and future production expansion
Pharmaceutical packaging facilities demand precision, reliability and full regulatory compliance. The electrical infrastructure needed to be robust, scalable and delivered without compromise to programme timelines.
Solution - Phase 1, Base Build
Callaghan Electrical completed the full electrical installation for the base build shell, providing the critical infrastructure required to support future operational fitout.
Works included:
-
Installation of main electrical panels and distribution systems
-
General power and electrical services
-
Internal lighting including office and open-plan areas
-
Emergency lighting systems
-
Fire alarm installation and wiring
-
External electrical works
-
Electrical works to lorry bays / roller doors
-
Bathroom lift installation
-
Preparation of infrastructure to support future production systems.
Solution - Phase 2, Base Internal
Appointed as the electrical fitout partner for Phase 2, Callaghan Electrical delivered a full operational electrical installation across the entire premises under a highly compressed timeline. The fitout covered:
-
Open warehouse areas
-
Two-storey office accommodation
-
Four production areas
-
Clean rooms
-
Ground floor operational space
-
Works included:
-
Lighting and general electrical services throughout
-
Fire alarm and fire detection systems
-
Aspirating smoke detection systems
-
Electrical installations for production areas and clean rooms
-
Changing facilities
-
Warehouse power and services
-
Cold rooms and freezer room installations
-
Installation and commissioning of a busbar system to support current and future production systems
The team coordinated closely with other trades and specialist suppliers to ensure seamless integration of electrical systems into regulated pharmaceutical production environments.
Benefits
The completed facility significantly expands PCI Pharma Services’ European packaging capacity, enabling:
-
Increased production of injectable and drug-device combination products
-
Enhanced temperature-controlled storage capabilities
-
Scalable infrastructure to support future operational growth
-
Improved energy performance and sustainability credentials
-
A high-spec, compliant environment aligned with global pharmaceutical standards
For Callaghan Electrical, the project demonstrated our capability at scale within the life sciences sector, delivering complex, high-compliance electrical installations on accelerated programmes without compromising quality, safety or performance.